Project Planning and Schedule Control Focused Products!
1. Sales for Project Proposal & Detail Schedule DB made by Primvera P6 software
(프리마베라 P6로 작성된 각종 프로젝트별 스케줄 Database 판매)
Power Plant
- 1×1000 MW Coal Fired Thermal Power Plant (3620 activities)
- 2×100 MW Coal Fired (Steam) Power Plant (129 activities)
- 5×600 MW Coal Fired Power Plant (278 activities)
- 10 ppm Diesel Project (98 activities)
- Thermal Power Plant (153/653/2133/2386 activities)
- Thermalelectronic (Steam) Power Plant (Warehouse, Mech.Room) (87 activities)
- CCPP (Combined Cycle Power Plant)(66/84/165/352/882/962/1230/1420/1720/5481 activities)
- 1440 MW CCPP (5071 activities)
- 1200 MW CCPP (1388 activities)
- 330 MW CCPP (198 activities)
- 500 MW CCPP (119 activities)
- 650 MW CCPP (143 activities)
- C4 CCPP (234 activities)
- 600 MW IPP (171 activities)
- 3×55 MW Combined Power Station (42/123 activities)
- 3×55 MW Combined Power Station (Extension) (72 activities)
- 49.9 MW Cogeneration (115 activities)
- Cogen Unit (114 activities)
- Power & Desalination Plant (159/952/1152/1636 activities)
- Power & Desalination (CCPP) (3233 activities)
- Desalination Plant (167 activities)
- Power Generation (122 activities)
- Power Generation Expansion (103 activities)
- Power Station (221 activities)
- 168 MW GTCC (293 Activities)
- Combined Heat & Power Plant (118/179 Activities)
- 화력발전소 탈질설비 (258 Activities)
- CES (Community Energy System) 열병합발전소 (443 Activities)
- HEPP (Hydroelectronic Power Plant – Dam) 수력발전소 (481/1095/1634 Activities)
- Nuclear Power Plant (원자력발전소) (6660/6855 Activities)
Module Fabrication
- FPSO (Floating Production Storage and Offloading) (828/1195 activities)
- LNG Upstream Facilities – (552/30236 activities)
- Oil Sand Project – Process Modules (4204/23979 activities)
- Oil Sand Project – Fuel Gas Stair Tower Module (66 activities)
- Oil Sand Project – Utilities – Natural Gas Letdown Module (165 activities)
Expansion
- CA4 Expansion (107 activities)
- CAPROLACTAM Expansion (156/236/1365/2834 activities)
- 30,000 MTY EPM/EPDM (Ethylene Propylene Rubbers and Elstomers) Plant – Expansion (235/571 activities)
- FLARE STACK UNIT – EXPANSION (3174 activities)
- GAS Expansion (340 activities)
- LNG (Liquefied Natural Gas) 인수기지 – Expansion (166/656/2000 activities)
- LNG Receiving Terminal – Expansion (430 activities)
- 65,000 MTPA MDI Plant – 10,000 MTPA Expansion (142 activities)
- PE – Expansion (77/258 activities)
- Oil Refinery – CCR(Continuous Catalyst Regeneration) Platforming Unit – Expansion (168 activities)
- RFCC – Expansion
- Refinery – Expansion (185/3173 activities)
- VCM (Vinyl Chloride Monomer) Expansion (223 activities)
- LNG Expansion (2000 activities)
Revamping
- BD(Butadien) Revamping (83 activities)
- BD E-Line Revamping (104 activities)
- BTX (Benzene, Toluene, Xylene) Revamping (483 activities)
- Cracking Furnace Revamping (109 activities)
- EB/SM Revamping (548 activities)
- FCC Revamping (1336 activities)
- NCC (Naphtha Cracking Center) Revamping (647 activities)
- NCC / BRU (Benzene Recovery Unit) / BD Revamping (844 activities)
- PB (Polybutylene) Revamping (105 activities)
- Refinery – FCC / CRU (Catalitic Reforming Unit) / Utilities & Offsite – Revamping (292 activities)
- SRU Revamping (131 activities)
Recovery
- C4 Recovery (60 activities)
- Cracker Complex (Ethylene) – Recovery (390 activities)
- CO2 Recovery (100 activities)
- PE – Recovery (76/184 activities)
Upgrading
- Desalter Dehydration Upgrading (153/174/1312 activities)
- DHDT / N2 / H3 Upgrading (439/764/2980 activities)
- DHDT / MSQ Upgrading (353 activities)
- Refinery – RHU (Residue Hydrotreating Unit) / RFCCU – Upgrading (225/1439 activities)
- Refinery – RHU / RFCC Reactor Section / Sour Water Stripper / Amine Recovery Unit / RFCC Gas Treat / Gasoline & LPG Merox – Upgrading (225 activities)
- RHU (Residue Hydrotreating Unit) Upgading (230/713 activities)
Infrastructure
- Infrastructure (Barrage, Shiplock and Bridge)
- Urban City – Infrastructure
- Refinery – Infrastructure (113 activities)
Pre-commissioning & Commissioning
- New Gathering Center – pre-commissioning (321 activities)
- Phosphate Project (Ammonia Plant) – pre-comm. & commissioning (536 activities)
- PP Project – pre-commissioning (610 activities)
M/C & Turnover
- M/C & Turnover Detail Schedule (3,176 Activities)
- Test Completion Detail Schedule (325 Activities)
Shutdown & Turnaround
- AN (Acrylonitrile) Turnaround (1055 activities)
- APS Turnaround (658 activities)
- CDU Turnaround (1896 activities)
- PP Turnaround (1015 activities)
- Power Plant (Auxiliary System, Boiler Unit, Turbine Generation) – Shutdown (58 activities)
- RFCCU Turnaround (2592 activities)
- CCR Platformer, Isomerization Turnaround (241 activities)
- Refinery – Capital & Turnaround Project (2272 activities)
- SRU Turnaround (604 activities)
- Styrene – Shutdown & Tie-In (95 activities)
- TCCU Turnaround (92 activities)
- WCN Turnaround (400 activities)
- Turnaround Master Schedule (249 Activities)
- Shutdown Master Schedule (56 Activities)
Civil / Train / International Airport / LRT / Public Housing / Building / Port / Sky Scrapers
- Express Way (고속도로) (1784 activities)
- High-Speed Railway Vehicle Base (고속철도 차량기지) (2846/4730 activities)
- Rail Infrastructure & Rail Station (철도시설 및 역사) (2881/5334 activities)
- Public Housing Complex B2F-5F (공용주택단지) (1852 activities)
- International Airport (2195 activities)
- Building Extension & Renovation (B4F-B1F, 1F-20F, PH1-2F) (403 activities)
- LRT (Light Rail Train) 경전철 (4818 activities)
- Office Building (161 activities)
- Internet Data Center Construction (1806 activities)
- Port (206 activities)
- Villa / Apartment (978 activities)
- Terrace House (1265/1851 activities)
- R&D Center & Office Building Erection / Fit-out (930 activities)
- Hosing & Office Complex Building (Sky Scrapers 초고층)
Oil Refinery / Gas / Petrochemical / Chemical / FPSO / Oil Sand Project
- ABS (Acrylonitrile Butadien Styrene) Resins (61 activities)
- ABS / SAN (Styrene-Acrylonitrile) (133 activities)
- AN (Acrylonitrile) (211/235/2381 activities)
- Air Separation Unit (207 activities)
- AROMA (Aromatic 방향족) (523 activities)
- BD E-Line / ABS (139 activities)
- BDO (Butanediol) (153 activities)
- BISPHENOL (771 activities)
- 100,000 MTPA BISPHENOL (131/1299/3155 activities)
- BITUMEN (236 activities)
- BT(Benzene, Toluene) Extraction (MODIFICATION) (75 activities)
- BT Extraction – LC Line Hammering (83 activities)
- C1 Chemical Complex (183 activities)
- Catalytic Dewaxying Unit (176 activities)
- Cathodic Protection (80 activities)
- Caustic Neutralization Unit (111 activities)
- Cracker Complex (Ethylene) – Furnace (250/482 activities)
- CCD (Carbonyle Chloride Derivatives) (175/248/1736/1834 activities)
- CCR (Continuous Catalyst Regeneration) / LSRN (Light Straight-Run Naphtha) Isomerization (756 activities)
- CCR Platformer (40,000 BPD) (251/671 activities)
- CCR Platforming Heater (73 activities)
- CDU (Crude Distillation Unit : 상압증류장치) – OVHD Condenser (53 activities)
- Cell Line Conversion (407 activities)
- Charge Heater – Cylindrical, Naphta Spitter Reboiler Heater (61 activities)
- Chemical Plant (66/280/855 activities)
- 50,000 MTY Chlorine Alkali (142 activities)
- 60,000 MTY Chlorine Alkali (99 activities)
- 190 MTD Chlorine Alkali (150 activities)
- Clean Fuels (164 activities)
- Cracked LPG Treatment Unit (134 activities)
- Crude Acetonitrile (MECN) Plant (129 activities)
- DHDS (Diesel Hydrodesulfurization) (713 activities)
- DHDT (Diesel Hydro Treatment) (165 activities)
- DHDT / Hydrogen Unit / Nitrogen Unit (353 activities)
- DNT (Dinitrotoluene), TDI (Toluene Diisocyanate), HNO3 (NItric Acid) (45 activities)
- EB (Ethyl Benzene) (276/699 activities)
- 646 KT/A EB (318 activities)
- EB/SM (Styrene Monomer) (299/400/436 activities)
- Effluent Water Disposal Plant (275/6402 activities)
- Effluent Water Injection (363/3497 activities)
- 30,000 MTY Epichlorohydrin (159 activities)
- Ethylene (138/144/536/743/836/1908 activities)
- Ethylene & EB/SM (2642 activities)
- Ethylene Plant – Utilities & Offsite (380 activities)
- Ethylene / Aromatics Complex (1943/3360 activities)
- Ethyleneamins (3381 activities)
- FCC (Fluid Catalytic Cracking) (331/562/2958/2968/3127 activities)
- FCC (RHDS, HYDROGEN, SULFUR(ARU, SWTU, SRU, TGTU), SAR (562 activities)
- FCC (RFCC, LEU, GAS CONCERN., GDS, ALKYLTION, PRU, RACK, OFFSITE, COOLING TOWER) (421 activities)
- GAS Plant (183/620/1618/2304 activities)
- GAS Development (115/154/211/256/283/369/484/529/599/1493/1786/1968/2038/2500/2992/3746/3753/4728/6601/6667/8028/9479 activities)
- GAS Project – DPCU (Dew Point Control Unit), Fractionation, Marine Terminal, Pipeline (946/4503 activities)
- GOD (Gas Oil Desulphurization) 중질유탈황설비 (EP-3630/C-5755 activities)
- HCU (Hydorcracking Unit) (198/204/277/1069 activities)
- HDPE (고밀도 폴리에틸렌) (123/239/390/559 activities)
- MDPE & HDPE (6495 activities)
- 300 KT/A MDPE (중간밀도 폴리에틸렌) & HDPE (310 activities)
- LDPE (309/540/1879 activities)
- 300 KT/A LDPE (저밀도 폴리에틸렌) (368 activities)
- LLDPE (선형 저밀도 폴리에틸렌) (300 activities)
- HDS (Hydrodesulphurization) (215 activities)
- HGU (Hydrogen Generation Unit) (114/143 activities)
- Hydrogen & PSA (Pressure Swing Adsorption) Unit (165 activities)
- Hydrotreatment & Isomerization (110 activities)
- Isomerization (256 activities)
- Isomerization Gas Oil Hydrotreater (308 activities)
- Incinerator (131 activities)
- K-resin Train (83 activities)
- LAB (340 activities)
- Lift Gas Distribution (136 activities)
- LNG / LPG (Liquefied Petroleum Gas) Storage Tank (152/374 activities)
- LNG Receiving Terminal (260/383/420/726 activities)
- LNG Storage Tank (388 activities)
- LNG Upstream Facilities (117/648 activities)
- LPG SEG (732 activities)
- Lube Base Oil Project (117 activities)
- Lube Waste Treating (138 activities)
- MDI (Methyl Di-p-phenylene isocyanate) (184 activities)
- Methanol (970 activities)
- MFC (Mixed Feed Cracker) (5368 activities)
- Naphtha Cracker (646/1819 activities)
- New Gathering Center (241/690/2510 activities)
- New and Interconnection Lines with Gas Gathering Center (400 activities)
- NG Expansion (175/537/873/4738 activities)
- NHT (Naphtha Hydrotreater) / CRU (Catalytic Reformer Unit) (143 activities)
- Nine Crude Oil Lines Replacement (166 activities)
- Nitric Acid Plant (124/181 activities)
- N-Paraffin and LAB (133/344 activities)
- OCT (Olefins Coversion Technology) Unit (135 activities)
- OCU (Olefins Conversion Unit) (356/377 activities)
- Oilfield (Jacket, Topside, Cables, Pipelines) (808 activities)
- Olefins (280/684/1667 activities)
- Olefins & Utilities (2357 activities)
- PA (Phthalic Anhydride) / DOP (Dioctyl Phthalate) (290 activities)
- PBT (Polybutylene Terephthalate) (763 activities)
- PDH (Propane De-hydrogenation) / PP (Polypropylene) (118/4485 activities)
- PE (Polyethylene) (150 activities)
- PE / Normal Alpha Olefin / Offsite & Utilities (528 activities)
- Petrochemical Plant (119/147/541/2382 activities)
- Petrochemical Plant – Offsite & Utilities (143 activities)
- Petrochemical Plant – Utilities (440 activities)
- Petroleum Lab (420 activities)
- Phenol (208 activities)
- Phosphate Project (Ammonia Plant) (4560/5191 activities)
- Polycabonate (334/376/1343/1734 activities)
- Polymer (884 activities)
- Polyol Capacity Increase to 55,000 MT (201 activities)
- Polystylene (418 activities)
- PP (Poly Propelene) (151/311/780 activities)
- PP – Utilities & Offsite (593/923/2696 activities)
- Propane Dehydrogenation (230 activities)
- PTA (Purified Telephtalic Acid) (151 activities)
- Pumpstation & Buildings (882 activities)
- PXU (Para-Xylene Unit) / Cristallizer Unit / Utilities & Offsite (115 activities)
- New Refinery (527/1642 activities)
- Refinery Project (234/259/481/760/1147/1279/2272/2496 activities)
- Refinery – NTP Schedule (143/171 activities)
- Refinery – Updating Program (970 activities)
- Refinery Project – Offsite & Utilities (1536 activities)
- Refinery – ARDS (Atmospheric Residue De-Sulphurisation) / VGO (Vacuum Gas Oil) / HDS (Hydro De-Sulfurization) Unit (2703 activities)
- Refinery – Bitumen (236 activities)
- Refinery – Feed Schedule (10265 activities)
- Refinery – HCU (322 activities)
- Refinery – HCU / Delayed Corker / Corker LPS Caustic Unit / Desalination Plant / Cooling Tower / Tank Farm Area (136 activities)
- Refinery – CDU/VDU/Piperack/Flare (3743 activities)
- Reformer Unit Heater (92 activities)
- Residue Desulfurization Unit (82 activities)
- RFCCCU (Residue Fluid Catalytic Cracking Unit) (3012 activities)
- RFCC Reactor & Sulfur Unit / PRU (Propylene Recovery Unit) / GHTU (Gasoil Hydor Treating Unit) / DHTU (Diesel Hydro Treating Unit) / LPG / Merox / RH (611 activities)
- RHDS (Residual Hydro Desulfurization) (113 activities)
- SCADA System (368/797 activities)
- SINTER Plants for De-Nox System (169 activities)
- SM (Styrene Monomer) (207 activities)
- SRU (Sulfur Recovery Unit) (126/264 activities)
- SRU / ARU (Armin Regeneration Unit) / SWSU (Sour Water Stripping Unit) (114 activities)
- Steam Generation Plant (126 activities)
- Styrene (347/1142/1553/1670/1691/3166 activities)
- Sulfuric Acid (89 activities)
- Sulphur Unit (163 activities)
- LNG & LPG Storage Tanks (374 activities)
- Raw Water Tank – Moving (129 activities)
- Tanks Erection (103/129/297/648 activities)
- Tank Terminal (132 activities)
- Tankage (152 activities)
- TDA (Toluene Diamine) / TDI (Toluene Diisocyanate) (2208 activities)
- Telemetry for Gas and Condensate (105 activities)
- Unleaded Gasoline (1022 activities)
- VBU (Vis-Breaker Unit) (139 activities)
- VDU (Vacuum Distillation Unit: 감압증류장치) / Hydrotreater Unit (수소처리장치) (352 activities)
- Water Injection (387 activities)
- WWT (Wastewater Treatment) (136 activities)