Products

Our Products

Project Planning and Schedule Control Focused Products!

1. Sales for Project Proposal & Detail Schedule DB made by Primvera P6 software
(프리마베라 P6로 작성된 각종 프로젝트별 스케줄 Database 판매)

Power Plant

  1. 1×1000 MW Coal Fired Thermal Power Plant (3620 activities)
  2. 2×100 MW Coal Fired (Steam) Power Plant (129 activities)
  3. 5×600 MW Coal Fired Power Plant (278 activities)
  4. 10 ppm Diesel Project (98 activities)
  5. Thermal Power Plant (153/653/2133/2386 activities)
  6. Thermalelectronic (Steam) Power Plant (Warehouse, Mech.Room) (87 activities)
  7. CCPP (Combined Cycle Power Plant)(66/84/165/352/882/962/1230/1420/1720/5481 activities)
  8. 1440 MW CCPP (5071 activities)
  9. 1200 MW CCPP (1388 activities)
  10. 330 MW CCPP   (198 activities)
  11. 500 MW CCPP   (119 activities)
  12. 650 MW CCPP   (143 activities)
  13. C4 CCPP  (234 activities)
  14. 600 MW IPP (171 activities)
  15. 3×55 MW Combined Power Station (42/123 activities)
  16. 3×55 MW Combined Power Station (Extension) (72 activities)
  17. 49.9 MW Cogeneration (115 activities)
  18. Cogen Unit (114 activities)
  19. Power & Desalination Plant (159/952/1152/1636 activities)
  20. Power & Desalination (CCPP) (3233 activities)
  21. Desalination Plant (167 activities)
  22. Power Generation (122 activities)
  23. Power Generation Expansion (103 activities)
  24. Power Station (221 activities)
  25. 168 MW GTCC (293 Activities)
  26. Combined Heat & Power Plant (118/179 Activities)
  27. 화력발전소 탈질설비 (258 Activities)
  28. CES (Community Energy System) 열병합발전소 (443 Activities)
  29. HEPP (Hydroelectronic Power Plant – Dam) 수력발전소 (481/1095/1634 Activities)
  30. Nuclear Power Plant (원자력발전소) (6660/6855 Activities)

Module Fabrication

  1. FPSO (Floating Production Storage and Offloading) (828/1195 activities)
  2. LNG Upstream Facilities – (552/30236 activities)
  3. Oil Sand Project – Process Modules (4204/23979 activities)
  4. Oil Sand Project – Fuel Gas Stair Tower Module (66 activities)
  5. Oil Sand Project – Utilities – Natural Gas Letdown Module (165 activities)

Expansion

  1. CA4 Expansion (107 activities)
  2. CAPROLACTAM Expansion (156/236/1365/2834 activities)
  3. 30,000 MTY EPM/EPDM (Ethylene Propylene Rubbers and Elstomers) Plant – Expansion (235/571 activities)
  4. FLARE STACK UNIT – EXPANSION (3174 activities)
  5. GAS Expansion (340 activities)
  6. LNG (Liquefied Natural Gas) 인수기지 – Expansion (166/656/2000 activities)
  7. LNG Receiving Terminal – Expansion (430 activities)
  8. 65,000 MTPA MDI Plant – 10,000 MTPA Expansion (142 activities)
  9. PE – Expansion (77/258 activities)
  10. Oil Refinery – CCR(Continuous Catalyst Regeneration) Platforming Unit – Expansion (168 activities)
  11. RFCC – Expansion 
  12. Refinery – Expansion (185/3173 activities)
  13. VCM (Vinyl Chloride Monomer) Expansion (223 activities)
  14. LNG Expansion (2000 activities)

Revamping

  1. BD(Butadien) Revamping (83 activities)
  2. BD E-Line Revamping (104 activities)
  3. BTX (Benzene, Toluene, Xylene) Revamping (483 activities)
  4. Cracking Furnace Revamping (109 activities)
  5. EB/SM Revamping (548 activities)
  6. FCC Revamping (1336 activities)
  7. NCC (Naphtha Cracking Center) Revamping (647 activities)
  8. NCC / BRU (Benzene Recovery Unit) / BD Revamping (844 activities)
  9. PB (Polybutylene) Revamping (105 activities)
  10. Refinery – FCC / CRU (Catalitic Reforming Unit) / Utilities & Offsite – Revamping (292 activities)
  11. SRU Revamping (131 activities)

Recovery

  1. C4 Recovery (60 activities)
  2. Cracker Complex (Ethylene) – Recovery (390 activities)
  3. CO2 Recovery (100 activities)
  4. PE – Recovery (76/184 activities)

Upgrading

  1. Desalter Dehydration Upgrading (153/174/1312 activities)
  2. DHDT / N2 / H3 Upgrading (439/764/2980 activities)
  3. DHDT / MSQ Upgrading (353 activities)
  4. Refinery – RHU (Residue Hydrotreating Unit) / RFCCU – Upgrading (225/1439 activities)
  5. Refinery – RHU / RFCC Reactor Section / Sour Water Stripper / Amine Recovery Unit / RFCC Gas Treat / Gasoline & LPG Merox – Upgrading (225 activities)
  6. RHU (Residue Hydrotreating Unit) Upgading (230/713 activities)

Infrastructure

  1. Infrastructure (Barrage, Shiplock and Bridge)
  2. Urban City – Infrastructure
  3. Refinery – Infrastructure (113 activities)

Pre-commissioning & Commissioning

  1. New Gathering Center – pre-commissioning (321 activities)
  2. Phosphate Project (Ammonia Plant) – pre-comm. & commissioning (536 activities)
  3. PP Project – pre-commissioning (610 activities)

M/C & Turnover

  1. M/C & Turnover Detail Schedule (3,176 Activities)
  2. Test Completion Detail Schedule (325 Activities)

Shutdown & Turnaround

  1. AN (Acrylonitrile) Turnaround (1055 activities)
  2. APS Turnaround (658 activities)
  3. CDU Turnaround (1896 activities)
  4. PP Turnaround (1015 activities)
  5. Power Plant (Auxiliary System, Boiler Unit, Turbine Generation) – Shutdown (58 activities)
  6. RFCCU Turnaround (2592 activities)
  7. CCR Platformer, Isomerization Turnaround (241 activities)
  8. Refinery – Capital & Turnaround Project (2272 activities)
  9. SRU Turnaround (604 activities)
  10.  Styrene – Shutdown & Tie-In (95 activities)
  11. TCCU Turnaround (92 activities)
  12. WCN Turnaround (400 activities)
  13. Turnaround Master Schedule (249 Activities)
  14. Shutdown Master Schedule (56 Activities)

Civil / Train / International Airport / LRT / Public Housing / Building / Port / Sky Scrapers

  1. Express Way (고속도로) (1784 activities)
  2. High-Speed Railway Vehicle Base (고속철도 차량기지) (2846/4730 activities)
  3. Rail Infrastructure & Rail Station (철도시설 및 역사) (2881/5334 activities)
  4. Public Housing Complex B2F-5F (공용주택단지) (1852 activities)
  5. International Airport (2195 activities)
  6. Building Extension & Renovation (B4F-B1F, 1F-20F, PH1-2F) (403 activities)
  7. LRT (Light Rail Train) 경전철 (4818 activities)
  8. Office Building (161 activities)
  9. Internet Data Center Construction (1806 activities)
  10. Port (206 activities)
  11. Villa / Apartment (978 activities)
  12. Terrace House (1265/1851 activities)
  13. R&D Center & Office Building Erection / Fit-out (930 activities)
  14. Hosing & Office Complex Building (Sky Scrapers 초고층)

Oil Refinery / Gas / Petrochemical / Chemical / FPSO / Oil Sand Project

  1.  ABS (Acrylonitrile Butadien Styrene) Resins (61 activities)
  2. ABS / SAN (Styrene-Acrylonitrile) (133 activities)
  3. AN (Acrylonitrile) (211/235/2381 activities)
  4. Air Separation Unit (207 activities)
  5. AROMA (Aromatic 방향족) (523 activities)
  6. BD E-Line / ABS (139 activities)
  7. BDO (Butanediol) (153 activities)
  8. BISPHENOL (771 activities)
  9. 100,000 MTPA BISPHENOL (131/1299/3155 activities)
  10. BITUMEN (236 activities)
  11. BT(Benzene, Toluene) Extraction (MODIFICATION) (75 activities)
  12. BT Extraction – LC Line Hammering (83 activities)
  13. C1 Chemical Complex (183 activities)
  14. Catalytic Dewaxying Unit (176 activities)
  15. Cathodic Protection (80 activities)
  16. Caustic Neutralization Unit (111 activities)
  17. Cracker Complex (Ethylene) – Furnace (250/482 activities)
  18. CCD (Carbonyle Chloride Derivatives) (175/248/1736/1834 activities)
  19. CCR (Continuous Catalyst Regeneration) / LSRN (Light Straight-Run Naphtha) Isomerization (756 activities)
  20. CCR Platformer (40,000 BPD) (251/671 activities)
  21. CCR Platforming Heater (73 activities)
  22. CDU (Crude Distillation Unit : 상압증류장치) – OVHD Condenser (53 activities)
  23. Cell Line Conversion (407 activities)
  24. Charge Heater – Cylindrical, Naphta Spitter Reboiler Heater (61 activities)
  25. Chemical Plant (66/280/855 activities)
  26. 50,000 MTY Chlorine Alkali (142 activities)
  27. 60,000 MTY Chlorine Alkali (99 activities)
  28. 190 MTD Chlorine Alkali (150 activities)
  29.  Clean Fuels (164 activities)
  30. Cracked LPG Treatment Unit (134 activities)
  31. Crude Acetonitrile (MECN) Plant (129 activities)
  32. DHDS (Diesel Hydrodesulfurization) (713 activities)
  33. DHDT (Diesel Hydro Treatment) (165 activities)
  34. DHDT / Hydrogen Unit / Nitrogen Unit (353 activities)
  35. DNT (Dinitrotoluene), TDI (Toluene Diisocyanate), HNO3 (NItric Acid) (45 activities)
  36. EB (Ethyl Benzene) (276/699 activities)
  37. 646 KT/A EB (318 activities)
  38. EB/SM (Styrene Monomer) (299/400/436 activities)
  39. Effluent Water Disposal Plant (275/6402 activities)
  40. Effluent Water Injection (363/3497 activities)
  41. 30,000 MTY Epichlorohydrin (159 activities)
  42. Ethylene (138/144/536/743/836/1908 activities)
  43. Ethylene & EB/SM (2642 activities)
  44. Ethylene Plant – Utilities & Offsite (380 activities)
  45. Ethylene / Aromatics Complex (1943/3360 activities)
  46. Ethyleneamins (3381 activities)
  47. FCC (Fluid Catalytic Cracking) (331/562/2958/2968/3127 activities)
  48. FCC (RHDS, HYDROGEN, SULFUR(ARU, SWTU, SRU, TGTU), SAR (562 activities)
  49. FCC (RFCC, LEU, GAS CONCERN., GDS, ALKYLTION, PRU, RACK, OFFSITE, COOLING TOWER) (421 activities)
  50. GAS Plant (183/620/1618/2304 activities)
  51. GAS Development (115/154/211/256/283/369/484/529/599/1493/1786/1968/2038/2500/2992/3746/3753/4728/6601/6667/8028/9479 activities)
  52. GAS Project – DPCU (Dew Point Control Unit), Fractionation, Marine Terminal, Pipeline (946/4503 activities)
  53. GOD (Gas Oil Desulphurization) 중질유탈황설비 (EP-3630/C-5755 activities)
  54. HCU (Hydorcracking Unit) (198/204/277/1069 activities)
  55. HDPE (고밀도 폴리에틸렌) (123/239/390/559 activities)
  56. MDPE & HDPE (6495 activities)
  57. 300 KT/A MDPE (중간밀도 폴리에틸렌) & HDPE (310 activities)
  58. LDPE (309/540/1879 activities)
  59. 300 KT/A LDPE (저밀도 폴리에틸렌) (368 activities)
  60. LLDPE (선형 저밀도 폴리에틸렌) (300 activities)
  61. HDS (Hydrodesulphurization) (215 activities)
  62. HGU (Hydrogen Generation Unit) (114/143 activities)
  63. Hydrogen & PSA (Pressure Swing Adsorption) Unit (165 activities)
  64. Hydrotreatment & Isomerization (110 activities)
  65. Isomerization (256 activities)
  66. Isomerization Gas Oil Hydrotreater (308 activities)
  67. Incinerator (131 activities)
  68. K-resin Train (83 activities)
  69. LAB (340 activities)
  70. Lift Gas Distribution (136 activities)
  71. LNG / LPG (Liquefied Petroleum Gas) Storage Tank (152/374 activities)
  72. LNG Receiving Terminal (260/383/420/726 activities)
  73. LNG Storage Tank (388 activities)
  74. LNG Upstream Facilities (117/648 activities)
  75. LPG SEG (732 activities)
  76. Lube Base Oil Project (117 activities)
  77. Lube Waste Treating (138 activities)
  78. MDI (Methyl Di-p-phenylene isocyanate) (184 activities)
  79. Methanol (970 activities)
  80. MFC (Mixed Feed Cracker) (5368 activities)
  81. Naphtha Cracker (646/1819 activities)
  82. New Gathering Center (241/690/2510 activities)
  83. New and Interconnection Lines with Gas Gathering Center (400 activities)
  84. NG Expansion (175/537/873/4738 activities)
  85. NHT (Naphtha Hydrotreater) / CRU (Catalytic Reformer Unit) (143 activities)
  86. Nine Crude Oil Lines Replacement (166 activities)
  87. Nitric Acid Plant (124/181 activities)
  88. N-Paraffin and LAB (133/344 activities)
  89. OCT (Olefins Coversion Technology) Unit (135 activities)
  90. OCU (Olefins Conversion Unit) (356/377 activities)
  91. Oilfield (Jacket, Topside, Cables, Pipelines) (808 activities)
  92. Olefins (280/684/1667 activities)
  93. Olefins & Utilities (2357 activities)
  94. PA (Phthalic Anhydride) / DOP (Dioctyl Phthalate) (290 activities)
  95. PBT (Polybutylene Terephthalate) (763 activities)
  96. PDH (Propane De-hydrogenation) / PP (Polypropylene) (118/4485 activities)
  97. PE (Polyethylene) (150 activities)
  98. PE / Normal Alpha Olefin / Offsite & Utilities (528 activities)
  99. Petrochemical Plant (119/147/541/2382 activities)
  100. Petrochemical Plant – Offsite & Utilities (143 activities)
  101. Petrochemical Plant – Utilities (440 activities)
  102. Petroleum Lab (420 activities)
  103. Phenol (208 activities)
  104. Phosphate Project (Ammonia Plant) (4560/5191 activities)
  105. Polycabonate (334/376/1343/1734 activities)
  106. Polymer (884 activities)
  107. Polyol Capacity Increase to 55,000 MT (201 activities)
  108. Polystylene (418 activities)
  109. PP (Poly Propelene) (151/311/780 activities)
  110. PP – Utilities & Offsite (593/923/2696 activities)
  111. Propane Dehydrogenation (230 activities)
  112. PTA (Purified Telephtalic Acid) (151 activities)
  113. Pumpstation & Buildings (882 activities)
  114. PXU (Para-Xylene Unit) / Cristallizer Unit / Utilities & Offsite (115 activities)
  115. New Refinery (527/1642 activities)
  116. Refinery Project (234/259/481/760/1147/1279/2272/2496 activities)
  117. Refinery – NTP Schedule (143/171 activities)
  118. Refinery – Updating Program (970 activities)
  119. Refinery Project – Offsite & Utilities (1536 activities)
  120. Refinery – ARDS (Atmospheric Residue De-Sulphurisation) / VGO (Vacuum Gas Oil) / HDS (Hydro De-Sulfurization) Unit (2703 activities)
  121. Refinery – Bitumen (236 activities)
  122. Refinery – Feed Schedule (10265 activities)
  123. Refinery – HCU (322 activities)
  124. Refinery – HCU / Delayed Corker / Corker LPS Caustic Unit / Desalination Plant / Cooling Tower / Tank Farm Area (136 activities)
  125. Refinery – CDU/VDU/Piperack/Flare (3743 activities)
  126. Reformer Unit Heater (92 activities)
  127. Residue Desulfurization Unit (82 activities)
  128. RFCCCU (Residue Fluid Catalytic Cracking Unit) (3012 activities)
  129. RFCC Reactor & Sulfur Unit / PRU (Propylene Recovery Unit) / GHTU (Gasoil Hydor Treating Unit) / DHTU (Diesel Hydro Treating Unit) / LPG / Merox / RH (611 activities)
  130. RHDS (Residual Hydro Desulfurization) (113 activities)
  131. SCADA System (368/797 activities)
  132. SINTER Plants for De-Nox System (169 activities)
  133. SM (Styrene Monomer) (207 activities)
  134. SRU (Sulfur Recovery Unit) (126/264 activities)
  135. SRU / ARU (Armin Regeneration Unit) / SWSU (Sour Water Stripping Unit) (114 activities)
  136. Steam Generation Plant (126 activities)
  137. Styrene (347/1142/1553/1670/1691/3166 activities)
  138. Sulfuric Acid (89 activities)
  139. Sulphur Unit (163 activities)
  140. LNG & LPG Storage Tanks (374 activities)
  141. Raw Water Tank – Moving (129 activities)
  142. Tanks Erection (103/129/297/648 activities)
  143. Tank Terminal (132 activities)
  144. Tankage (152 activities)
  145. TDA (Toluene Diamine) / TDI (Toluene Diisocyanate) (2208 activities)
  146. Telemetry for Gas and Condensate (105 activities)
  147. Unleaded Gasoline (1022 activities)
  148. VBU (Vis-Breaker Unit) (139 activities)
  149. VDU (Vacuum Distillation Unit: 감압증류장치) / Hydrotreater Unit (수소처리장치) (352 activities)
  150. Water Injection (387 activities)
  151. WWT (Wastewater Treatment) (136 activities)

2. Primavera P6 교육매뉴얼 및 교육 DB 판매

Need help with easier Project Planning and Schedule Control solutions? We Are Experts!